2021项目管理师考试题免费下载6篇 第1篇


预算成本及实际成本中的累积成本及人工工时按时间进度划分其图形被称为( )

A.趋势线

B.趋势分析

C.S曲线

D.挣值报告

正确答案:C


54 Historical records during close-out are useful to _____ and _____ for future projects.

A. Predict trends, highlight problems.

B. Analyze successes, shortfalls.

C. Analyze strengths, document results.

D. Support litigation, defend claims.

E. Justify results, set standards

正确答案:A


14 In acceptance sampling, if the sample size is kept the same but the acceptance number is increased, which of the following will be true:

A. buyer's risk will decrease

B. vendor's risk will decrease

C. producer's risk will decrease

D. consumer's risk will increase

E. C and D only

正确答案:E


你的经理是PMI的长期会员,他给公司在海外举行的课程参加者分发其复印的PMBOK指南而没有预先征得PMI的同意,因而被指控违反PMI的知识产权政策规定。一个PMI道德评审委员会正在评审这个案例的细节。你没有这个案例的一手材料,但你我记起2年前你的项目经理因滥用PMI商标而被PMI主管领导训斥的事。你6个月前参加PMI,已经读过其道德标准。昨天,一位PMI道德评审委员会的成员请你回答有关你的经理犯罪的一系列问题。在这种情况下,你——( )

A.不要参与,因为你不是处理道德问题的成员

B.有责任配合PMI收集有关违背职业道德的信息

C.没有责任,因为这起所谓的侵权案发生时你还不是PMI的成员

D.没有义务为PMI提供任何信息,因为你对当前的案例一无所知

正确答案:B


● Your team has prepared a CPM schedule for your review. You notice that one node has six inputs (including two dummy activities) and four outputs (which include one dummy activity). Select the correct statement from the following:

A This is a valid representation if the logic is correct.

B This is invalid because a node can have a maximum of one dummy input representation if the logic is correct.

C This is invalid because nodes cannot have both dummy inputs and dummy outputs.

D This is a invalid because the number of outputs must equal the number of inputs.

E This is invalid because a maximum of two inputs and two outputs are allowed using the critical path method.

正确答案:A


147 Parametric estimates are based on variables such as:

A. Detailed planning and cost restraints.

B. Physical characteristics and historical data.

C. The WBS and similar projects.

D. Project objectives and manpower allocations.

E. Precise measurements and multiple inputs

正确答案:B


Quality management:

A . is another name for careful inspections.

B . is inversely related to productivity.

C . is primarily the responsiblity of management.

D . is primarily the responsibility of the workers.

E . is essentially a motivational technique.

正确答案:C


项目经理绝对需要良好的沟通及协商技巧因为( )

A.他应领导一个没有直接控制关系的团队

B.采购活动需要

C.他们被希望是技术专家

D.他们必须向执行者/客户/业主提供简报

E.以上都是

正确答案:A


191 Uncertainty refers to a situation where:

A. the outcomes are known but their probabilities are high

B. the outcomes and their probabilities are known

C. neither the outcomes nor their probabilities are known

D. states of nature can change at any time

E. probabilities of various states of nature can change at any time

正确答案:C


2021项目管理师考试题免费下载6篇 第2篇


你需要缩短项目完工日期。没有额外的资源,但项目风险低。如果要优先考虑依赖关系,最佳的备选取方案是什么?( )

A.停止一项任务的资源

B.把资源从优先依赖关系移到内部依赖关系

C.削减项目任务

D.把更多的任务同时进行

正确答案:D


76 The most frequently used construct in Precedent Diagramming Method is:

A. Start to Start.

B. Finish to Finish.

C. Start to Finish.

D. Finish to Start.

E. Dummy activity

正确答案:D


以下哪一项不属于做好项目进度计划编制工作的根本需求?

A、 降低成本、减少时间

B、 减少决策需要的时间

C、 消除闲置时间

D、 制定更好的排除故障的步骤

正确答案:D


一种项目经理和项目队员之间没有信息互动的管理方式叫做——( )

A.以自我为中心的

B.民主的

C.参与式的

D.放任自流的

正确答案:D


124 Which of the following organizations has the best technical project control?

A. matrix

B. functional

C. projectized

D. B and C

E. A and B

正确答案:D


● The most common non-behavioral reason for projects being completed behind schedule and over budget is:

A Selecting the wrong person as the project manager

B Selecting the wrong person as the sponsor

C Accepting a high-risk project

D Ill-defined requirements

E All of the above

正确答案:D


189 The utility of network-based schedules:

A. Reveals interdependencies.

B. Facilitates "what if" exercises.

C. Highlights critical activities.

D. Provides information on resource requirements, time requirements and tradeoffs.

E. All of the above

正确答案:E


购买订单是什么合同形式的例子:

A.单边合同

B.双边合同

C.三边合同

D.可分割合同

正确答案:A


76 During which phase of the project life cycle is the amount at stake lowest?

A. concept

B. development

C. execution

D. conclusion

E. C and D

正确答案:A


2021项目管理师考试题免费下载6篇 第3篇


25 In which of the following scope management processes is the scope management plan prepared? A. Initiation

B. Scope planning

C. Scope Definition

D. Scope change control

E. Scope verification

正确答案:B


可变的质量数据是 ( )

A.数量及质量数据

B.产品或服务被设计或生产的质量数据

C.反映对一个产品或服务的特性持续测量

D.显示管理层对变量设计理解

E.B及C

正确答案:E


在哪一个过程组中我们可确定项目所需的人力和非人力资源?

a. 立项

b. 实施

c. 计划

d. 控制

e. 收尾

正确答案:A
112. a  [See chapter study notes, Under the heading of Core Processes for the Planning Process Group. Resources are guesstimated in this process group.]


条件图法如GERT用于:( )

A.表示四种依赖关系(完成-开始 完成-完成 开始-开始 开始-完成)

B.创建一个比PERT图还容易解释的网络图形

C.因为PCM和ADM不允许非序列活动,如回环或条件分去

D.帮助促进项目网络图的准备

正确答案:C


在项目第一个阶段结束时,在开始下一个阶段之前你应确保-----

A、 具备下个阶段所用的资源

B、 进展符合其基线计划

C、 为达到项目结果采取纠正措施

D、 该阶段已经达到目标并正式接收其可交付成果

正确答案:D


一个项目的设计估算为100000美元,在决定是否采用这个估算是时候,我们预期这个估算的正确范围应该是:( )

A.+10% to -15%

B.+25% to -10%

C.+10% to -5%

D.+10% to -25%

正确答案:B


试验设计在质量计划编制中的作用在于:

A、 确定哪些对整体产出影响最大

B、 对比各种项目质量管理实践

C、 说明系统各元素间的联系

D、 确认何处需要进行少量返工

正确答案:A


101 The actual configuration of a PERT/CPM network _____ the amount of resources that can be devoted to the project.

A. Increases.

B. Is not affected by

C. Does not require

D. Is heavily dependent upon

E. Is the only means of determining

正确答案:D


34 Three types of written media used in organizations are _____, _____, and ______.

A. manual, letters, guidelines

B. individually-oriented, legally-oriented, organizationally oriented

C. guidelines, forms, procedures

D. letters, guidelines, brochures

E. letters, contracts, policies

正确答案:D


2021项目管理师考试题免费下载6篇 第4篇


在项目计划编制的早期阶段,项目经理的领导方式是:

A、 教练

B、 支持

C、 代表

D、 指挥

正确答案:D


92 The ability to reduce risk is _____ to how far you have progressed through the project life cycle. A. inversely proportional

B. directly proportional

C. not related

D. the responsibility of the risk executive

E. is directly proportional to the amount at stake

正确答案:A


In a flowchart, the diamond form. is used to represent:

A . a starting point.

B . an operation.

C . a written report.

D . a decision point.

E . an end point.

正确答案:D


149 As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:

A. Insignificant.

B. Reduced.

C. Unchanged.

D. Increased.

E. Doubled

正确答案:C


In communications management, to assimilate through the mind or senses (as in new ideas) is the process of

A Understanding

B Communicating

C Receiving

D Decoding

E Comprehending

正确答案:C


10 The project charter is developed by:

A. senior management

B the customer

C. the project manager

D. both A and C

E. None of the above

正确答案:D


你正管理着一个大型项目,这个项目的核心团队由8名高工组成,他们每个人都是自己领域里的专家。这些团队成员都具有非常高的创造性,他们工作的时候不喜欢受到约束,通常是想什么时候去做就什么时候去做,完全不顾这项工作在项目进度中的顺序。你担心这种工作方法会给项目带来麻烦,特别是对项目的进度约束、众多的接触面和外部依赖等方面影响更甚。因此,你召开了一个团队会议来讨论一套让大家遵守的程序,以此来保证工作按照正确的顺序、在规定的时间完成。在这次会上,你使用了

A、 进度管理计划

B、 工作授权系统

C、 变更控制系统

D、 项目管理信息系统

正确答案:B


117 Using the figure in the Special window, Activity "L" has an early start time of _____ weeks and an early finish time of _____ weeks.

A. 11, 13

B. 12, 14

C. 13, 15

D. 14, 16

E. 15, 17

正确答案:E


● Management has decided to "crash" a project in order to avoid penalty payments for late deliveries. To crash the project, either overtime or additional resources should be assigned to:

A All activities.

B Only those activities with the longest time durations.

C Those activities on the critical path begining with the longest time duration activities.

D Those activities with the greatest degree of risk.

E None of the above.

正确答案:C


2021项目管理师考试题免费下载6篇 第5篇


在谈判中最常见的问题是—— ( )

A.每一方都误解另一方说的话

B.每一方都对另一方失望

C.一方试图扰乱另一方

D.一方只想着下一步怎么说,而没有去听对方所说的

正确答案:A


5 The type of power most infrequently used by the PM is

A. formal authority

B. reward power

C. referent power

D. expert power

E. penalty

正确答案:A


业绩报告主要用于向干系人提供关于项目范围、进度、成本以及质量方面的信息。下列哪些陈述最准确地说明了这一过程?

A、配置控制委员会收到业绩报告并提出变更要求来调整相应的工作

B、业绩报告主要用于考察挣值分析,借以判断成本是否超支,是否需要修改预算

C、业绩报告包括详细项目状态报告、项目进度报告 和分析项目未来状态和进展情况的预测报告

D、业绩报告包括柱状图、流程图以及条形图来说明项目各组成部分和工作间的相互信赖关系

正确答案:C


Work packages are used to:

A . Represent units of work at a level where work is performed.

B . Clearly distinguish one work package from all others assigned to a single functional group.

C . Limit the work to be performed to relatively short periods of time.

D . All of the above.

E . A and B only

正确答案:D


● Configuration (baseline) control monitors performance against the

A scope baseline

B original schedule

C original budget

D All of the above.

E None of the above.

正确答案:A


88 A variance envelope has been established on a project. The envelope goes from +-30% in R&D to +-5% during manufacturing. The reason for the change in thickness of the envelope is because:

A. The management reserve has been used up.

B. The accuracy of the estimates in manufacturing are worse than the estimates in R & D.

C. Tighter controls are always needed as a project begins to wind down.

D. Of the personal desires of the project sponsor.

E. Of none of the above

正确答案:E


你正在巴布亚新几内亚的波特摩斯比管理一个很精密而且技术上也很复杂的数据库侵入屏蔽项目。这个数据中心要为一家零售商提供500台服务器的容纳量,而这家零售商是世界上最大的零售商之一,而且该公司已经决定要在亚洲启动电子商务项目。尽管这一地区具备难得的经济优势,但迫于台风的威胁你还是准备了一套备用计划,即在这个数据中心遭洪水侵袭时,要改在马尼拉外围实施项目。这属于哪种类型的风险应对措施?

A.被动规避

B.缓解风险

C.积极面队

D.偏转避险

正确答案:C


114 Financial compensation is the primary motivational tool for which of the following management theories of programs.

A. Zero-defects program.

B. theory X management.

C. theory Y management.

D. Quality control circles.

E. A and C

正确答案:B


在什么情况下,重新制定基准计划可以成为成本控制的一个输出?

A、 出现严重成本偏差,必须采取实际的执行措施

B、 修订的成本估算已经准备好并且发布给项目干系人

C、 必须采取纠错行动,达到符合项目计划的预期未来绩效

D、 A和C

正确答案:A


2021项目管理师考试题免费下载6篇 第6篇


用来预测项目完成日期的SPI运用的计算方程式是:( )

A.EV/AC

B.PV/EV

C.ACWS/PV

D.EV/PV

正确答案:D


Sunk costs are:

A.future costs held in reserve.

B.costs invested in commodities.

C.expended costs over which we have no control.

D.expended costs over which we have no more control

E.tax credits

正确答案:D
D


确定项目的技术要求是重要的一个步骤,因为这些要求:

A、 用平实的语言说明了可交付成果的特征

B、 帮助项目人员确定工作目标

C、 对项目人员和客户都有用。

D、 可以用来确保客户知道他们可以从项目中得到什么。

正确答案:B


风险管理的什么过程会对项目的计划产生影响?

A、 风险识别

B、 风险的定性分析

C、 风险的应对规划

D、 风险监控

正确答案:C


买方与卖方已谈好了一个成本加激励的合同。合同的标的成本是30万美元,目标费用是4万美元,各方承包比例是80/20,最大费用是6万美元,最小费用是1万美元。如果卖辩证实际的成本是38万美元,买方将付多少?( )

A.104000美元

B.56000美元

C.30000美元

D.24000美元

正确答案:D


26 Job descriptions are examples of ______communications.

A. upward

B. downward

C. horizontal

D. diagonal

E. None of the above

正确答案:E


许多小组成员就快要一起离开公司,项目经理首先应该做什么?

A、 修订WBS

B、 招募小组成员

C、 实施风险应对

D、 修订线性职责图

正确答案:C


54 Historical records during close-out are useful to _____ and _____ for future projects.

A. Predict trends, highlight problems.

B. Analyze successes, shortfalls.

C. Analyze strengths, document results.

D. Support litigation, defend claims.

E. Justify results, set standards

正确答案:A


166 Risk mitigation includes all but which of the following:

A. Developing system (policies, procedures, responsibilities)

B. Obtaining insurance against loss

C. performing contingent planning

D. developing planning alternatives

E. identification of project risks

正确答案:E